Updating an apartment building

Ixelles
2020
Phase
Exécution
Cost
10. 270. 000€ HTVA
Surface
10 960 m²
Commanditaire
SLRB-BGHM / SCRL BinHôme
Mission
Mission complète d'architecture et de rénovation
Association
Karbon' et Label
Consultant
NEY & Partners WOW / MKEngineering / Retrival / Carbonifère
Pictures
Karbon' Photographie

Built in 1961 opposite the former Ixelles gendarmerie school (now Usquare), this building was originally designed to house the "married gendarmes" working on the other side of the street. The building completed a composite block that was finally closed in 1977. The curiosity of this building lies in its inverted typology - the entrances are all located at the heart of the block via an internal alleyway - which makes it a through block along its length.

After a few years of precarious occupation - allowing a precise inventory to be made of all the materials - followed by a period of full-scale tests on the different types of flat, it is now undergoing a measured renovation as a pilot project in the circular economy and reuse. This is a carefully thought-out process that will enable the project's hypotheses to be verified as it progresses. The approach is based on the formula of K. Berghmans and B. Robles Hidalgo's phrase "Maintenance as architecture", asserting that instead of focusing on design and innovation, current architectural practice could be conceived as the maintenance and "care" of existing buildings. This act of sobriety through the choice of targeted and considered interventions is an economic and environmental commitment.

The updating of the interior accentuates the through-going aspect of the flats in a rational way by opening up the interior spaces and enlarging the loggias. These are used more effectively, with a clearer "day/night" division. In addition, we have taken advantage of elements that are still in good condition, such as the aluminium frames, the built-in kitchen furniture and all types of finishes and equipment that can be reused.

Work on the limits of intervention and analysis of existing qualities are at the heart of the thought process to limit incoming and outgoing materials. During the construction phase, the site acts as an exchange platform: if the materials are not re-used or diverted in situ, they are evacuated to re-use channels and replaced by materials from similar circuits.

361 BRO

358 TIL

353 VANHOE

351 MOCK

338 HEN

337 GUE

336 BED

335 PTB

334 CYGNES

331 INITIATIVE

331 GERA

329 PDL

318 POGGE

317 BRIC

306 VAL

298 BAU

289 VIGNETTE

286 NESPA

278 BERCHEM

268 CAR

218 CRU

207 VML

203 MOL

198 TOUR

192 GOU

178 STH

161 GEM

160 HDB

157 VRM

156 ABEH

149 GREN

145 CQDA

143 ZOE

138 PWB

132 ESN

126 STA

121 CAB

104 NAV

102 JON

096 MAZ

095 TOF

083 ESP

072 CRP

062 MDV

059 DEW

057 COL

051 BRU

038 HOM

037 VDN

033 GEM

032 TOR

001 SCH

000 GRA

000 CHSK